For electrical, plumbing, mechanical, fire and low-voltage contractors

Records You
Can Trust.

Made by the crew that installed them, captured at the wall before it closes, and pinned to your drawings.

Scan a QR code at the wall and land on the drawing for that room. Your crew captures each device with a photo, serial and model before it gets covered, pinned to its spot on the drawing. That record backs your closeout, your claims and your service work, and it's made by the people already holding the equipment.

Book a Demo
  • Backcharges

    "Who installed it, when, with a photo." Your answer when someone says your crew got it wrong.

  • Blocked crews

    A dated record of what was done in each room, and what was still waiting.

  • Closeout and retainage

    The device record is built during the job, not reassembled in the last month.

  • Service calls

    Your techs open the drawing and see what's behind the finished wall before they cut it.

  • Wrong revision

    The QR code opens the drawing for that room, not the print on the truck.

Built from your drawings · panel and equipment schedules · QR scans at the wall · serial, model and photo · submittals · install status
14 hrs
A week, per worker, lost hunting for project data, resolving conflicts and fixing mistakes
FMI + PlanGrid, 2018
7.25% to 10.89%
What average rework can cost, as a share of total construction cost, direct and indirect combined
Navigant Construction Forum, 2012
48%
Of rework on US jobs traced to miscommunication and poor project data
FMI + PlanGrid, 2018
80%
Of contractors say design documents in bid packages are getting worse
Dodge Construction Network + CMiC, 2026

The drawings say what was supposed to go in. Nobody wrote down what did.

What leaves with the crew

Your crew knows the air handler got swapped in month nine, the receptacle moved two feet for the casework, and the valve sits behind the ceiling grid, not where the drawing shows it. Three months later that knowledge is on the next job.

When the owner, the GC or your own service tech asks what went in, you're paying someone to go find out, or eating the cost of being wrong.

What the drawing says

Tag
VAV-U-17
Model
Per the schedule
Serial
Not on the drawing
Location
Roughly here

What went in, recorded

Model
Titus DESV
Serial
Captured at rough-in
Photo
Attached
Installed
Who, and when
Location
Pinned on the sheet
How the record gets made

Closeout without the scramble.

Three moments on the job. The same record carries through all of them.

01

On the Drawing

Your PDF plan sets go in. Devices and equipment are read off the drawings and schedules and pinned to their spot. A QR sticker in each room opens the drawing for that room.

When: the drawings are loaded
02

Before the Wall Closes

The crew captures serial, model and photo at rough-in. For equipment that has to be recorded, it can't be marked roughed in until the capture is done.

When: rough-in, wall still open
03

After the Job

The record stays with the job: for your closeout package, for a dispute a year later, and for your service department every time they're called back.

When: closeout, and every callback after

See How It Works

See it on the job

What the crew captures, and what it saves you.

Answer the backcharge with a photo.

The crew records the serial, model and a photo of each device before it's covered, with who installed it and when. That's the cheapest moment this information will ever have.

TradePlane on iPad: a return air grille's record open over the drawing, with its rough-in checklist and Add Photo
Why you can rely on the record

Why the record holds up.

A record only helps you if the people reading it can believe it: your PM, the GC, the inspector, your service tech. So TradePlane is built around three rules.

Made by the hands that installed it

Every entry carries who captured it, when, and a photo.

We keep the record. We never sign off on it.

Your inspector, your engineer or the AHJ signs. TradePlane isn't the compliance authority.

Walled off from everyone else

Each company's data is kept separate, and permissions are checked on our servers.

We're building this with contractors, starting in Cincinnati.

TradePlane is built in Cincinnati, and we work directly with specialty contractors across the region. If you run crews and want the product shaped around how your shop actually works, start with a 30-day pilot on one of your jobs.

Direct Founder Access

You work with the people building TradePlane. Questions get answered fast. Issues don't sit in a queue.

Hands-On Setup

We come to your site, load your drawings, get your crew scanning, and stay until it runs the way you need.

Shaped by Your Jobs

Your jobs and your pain points decide what gets built next. You tell us in person, and we build from that.

Book a Demo

Straight answers.

My crews won't use another app.

There's nothing to download. TradePlane runs in the phone's browser. A crew member scans the QR code, lands on the drawing for that room, and logs in with a text-message code. No app, no password.

We already pay for a project management platform.

Those are built to run the whole job from the office. TradePlane is built for the person at the wall: one scan, the right drawing, and a record of what went in.

My foremen don't have time for this.

The record gets made while they're already standing at the device: a photo, the serial and the model, pinned where it went in. Nobody reassembles it at the end of the job.

Who owns the data we put in?

You do. The install records, photos, serial numbers and reports your crews capture on your projects are yours to keep.

More Questions

Record it once, while the wall is still open.

Tell us about the job coming up. We'll show you what its record would look like on your own drawings.